Replacement of the battery power bank on Deal Island including the following:
· Decommission 24 existing flooded lead acid batteries.
· Supply, install and commission new 18 x 4kWh lithium batteries, storage cabinets and associated equipment within the existing Generator Shed (subject to legislative compliance)
· Minor reconfiguration of the interior of the ‘generator shed’ to allow for the fitment of the cabinets that contain the lithium batteries. PWS staff to assist.
· Modify existing remote area power system controls to ensure the new installation operates effectively.
· Generate a maintenance schedule and manual for use/troubleshooting.