PWS are proposing the construction of a replacement jetty on the western side of Lake St Clair at Echo Point. The scope of works includes the removal and disposal of two thirds of the existing jetty structure; the section of jetty that connects to the land will be retained. This section will be redecked with FRP grating. The construction of the replacement section of jetty will involve driving steel posts into the lake bed.
Your session has timed out. To continue on this page, please refresh by pressing F5.