Reconstruction of the existing shoulder to an overall width of 1.5 metres inclusive with a 1.0 metre seal and 0.5 verge.
The works are located on Esk Main Rd between Stynes Creek Bridge and St Pauls River Bridge, Avoca, and Killymoon Bridge to St Marys.