Consultants are required to undertake Geotechnical / piling investigation, Hydraulic investigation and Site Survey and develop a report to provide the input parameters for the design for the replacement of five (5) bridges on Wielangta Road
After completing a report on the design parameters consultants are required to make recommendations on the preferred design solution and develop concept designs for a preferred replacement option and estimate the cost of construction for the proposed bridge/culvert replacement options at each of the five locations identified.