This contract involves providing two 3m wide travel lanes, one in each direction, a third, 2.3m wide queuing lane on the northern side of the road and a 1.35m concrete footpath on the southern side of the road and concrete footpaths adjacent to Corby's Road. The proposed contract period is 26 weeks.