Install CAT6A data cabling and Telstra WAPs as specified in the Scope of Works - Section 3 “Required Work”. This installation is for Midlands (Oatlands) Multi-Purpose Health Centre (OMPC) by deploying 43 new Wireless Access Points (WAPs).
Your session has timed out. To continue on this page, please refresh by pressing F5.