Tenders are being sought from suitably qualified consultants who wish to be
considered for the provision of a comprehensive scientific and engineering
study of the Old Tailings Dam at the Savage River Mine.
Oxidation of pyrite in the tailings has resulted in streams of acid rock
drainage that seep from the dam wall. This study should ultimately provide
sufficient information to allow the Savage River Rehabilitation Project (SRRP)
to develop a strategy for the long-term management of the dam and to measure
the success or otherwise of any acid drainage remediation programs.
The study will include the investigation of both surface and ground water
hydrology and chemistry; oxidation development, progression and geochemistry;
acid drainage generation and solute transport; dam stability; and long-term
management and closure. The study will also include a drilling, sampling and
testing program.
The SRRP involves the remediation of historical acid drainage sources on the
Savage River Mine site and is a joint venture between the Department and
Australian Bulk Minerals.