Demolition of all structures on the site of 18-20 Ellison Street, Newstead, disconnecting current utilities to be sealed at the site connection for potential future construction, clearing existing gardens and paved areas including concrete paths and parking lots, installing cutoff drainage to contain stormwater within the site, and applying new gravel cover to reduce erosion.