As a result of two significant storm events, urgent remedial works are required to the Darlington Jetty, Maria Island. Works include, repairs to jetty timber piles using Denso Sea Shield 400 System. The removal of wave panels, and manufacture and replacement of walers and subsequent reinstallion of wave panels.