The objective of the procurement is to procure the construction services for the strengthening of three existing bridges, with identified structural deficiencies, to the required standards.
Below are a list of bridges:
|
B2236
|
Duck River Bridge
|
Bass Hwy
|
|
B864
|
Ringarooma Bridge
|
Tasman Hwy
|
|
B4565
|
Little Forrester FO
|
Tasman Hwy
|