The scope of this project includes the extensive refurbishment of the existing RHH Level 4 D-Block Holding Bay, and existing Recovery Bay. This includes a complete demolition of the existing space, new radiation shielding, reconfiguration of services such as electrical, hydraulic, ICT and medical gas, upgrade, and reconfiguration of HVAC systems, and the potential installation of new wet fire system (or equivalent alternative).